mrcat猫先生官网-MrCat猫先生电竞

首页 > 解决方案 > Case
解决方案 案例展示

Key project - Shanghai- Kunming High- Speed Railway (Hunan section)

 
 

 Shanghai- Kunming High- Speed Railway passenger dedicated line starts from Shanghai in the east and arrives in Kunming in the west. It is the East-West high speed railway with the longest mileage, the most influential area and the coverage of most provinces in China.  Shanghai- Kunming High- Speed Railway has a mileage of 508 kilometers in Hunan territory. 

The full line GSM-R wireless communication system adopts the BSCe3/GSM9000 type digital mobile communication base station subsystem equipment provided by Ticom Tech and KAPSCH, including 97 sets of online equipment GSM9000 base station, 1 set of BSCe3 base station controller, 1 set of TCUe code speed converter, 1 set of PCUSN packet control unit, and 1 set of OMC-R network management system.The whole line GSM-R digital mobile communication base station subsystem equipment had been officially put into use in December 2014. So far, the equipment has been running stably and reliably, the field strength has been well covered, and the network management system has run normally. All the functional indexes completely meet the relevant requirements of the former Ministry of Railways and the Ministry of Information Technology, thus ensuring the safe and efficient operation of Kunming High- Speed Railway (Hunan section). 


 
 
 

上一条:Key project -Lhasa- Shigatse High-speed Railway

下一条:Key project - Shanghai- Kunming High- speed Railway (Eastern Guizhou section)

Baidu
sogou